亚洲午夜精品久久久久久APP

尝辞肠补迟颈辞苍:Home?>?detail
Phase I Project of Chongqing Rail Transit Line 5
厂辞耻谤肠别:颁搁贰颁 顿补迟别:2018年11月28日

The total length of the line is 39.75 kilometers, of which the underground line is about 31.18-kilometer-long, the elevated line is about 8.12-kilometer-long, the ground line and the open section are about 450-meter-long. It set 25 stations and the total investment of the project is about 20 billion yuan.

Phase I Project of Chongqing Metro Line 5

?

Print Close