亚洲午夜精品久久久久久APP

尝辞肠补迟颈辞苍:Home?>?detail
尝辞肠补迟颈辞苍: Home?>?Core Business?>?Resource Development
La Sino-Congolaise Hydroélectrique de Busanga, S.A.(Sinohydro)
厂辞耻谤肠别:颁搁贰颁 顿补迟别:2025年08月08日

The Busanga Hydropower Station in the DRC, operated and managed by Sinohydro, has a total investment of USD 656 million, with an installed capacity of 240 MW and a designed average annual power output of 1.331 billion kWh, accounting for approximately one-tenth of the DRC’s total electricity generation. It is the first large-scale modern hydropower station in the DRC that is built entirely with Chinese standards, equipment, and technology. Currently, the company is planning to build a new 240 MW photovoltaic power station, aiming to achieve a complementary synergy between hydropower and solar energy, and to establish an integrated green energy development system in the DRC.

Print Close